컨텐츠 내용
- 수강신청
- 과정정보
SAP S/4HANA PP 마스터 패키지
차시 | 강의명 |
---|---|
1차시 | 강사 인트로 |
2차시 | Accessing and Creating Types of Data |
3차시 | Using Organizational Elements and Master Data in Production |
4차시 | Introducing Material |
5차시 | Creating a Material |
6차시 | Assign Documents |
7차시 | Classifying Material |
8차시 | Managing the Material |
9차시 | Working with the Product Master |
10차시 | Introducing Bills of Material (BOMs) |
11차시 | Managing BOMs |
12차시 | Changing BOMs with Engineering Change Management |
13차시 | Performing mass changes and working with browsers |
14차시 | Analyzing BOMs |
15차시 | Creating Work Centers |
16차시 | Creating Capacities in a Work Center |
17차시 | Explaining Task Lists |
18차시 | Creating Material Assignments and Component Allocations |
19차시 | Creating Suboperations and User-Defined Fields |
20차시 | Creating Product Versions |
21차시 | Creating Production Resources and Tools (PRTs) |
22차시 | Analyzing and Changing Task Lists |
23차시 | Describing Phantom Assemblies |
24차시 | Creating Co-Products and By-Products |
25차시 | Creating Alternative Components |
26차시 | Creating Multiple BOMs |
27차시 | Creating Variant BOMs |
28차시 | Modeling Sequences |
29차시 | Modeling Alternative Manufacturing Processes |
30차시 | Creating Reference Operation Sets |
31차시 | Applying Lead-Time Scheduling to Update a Material |
32차시 | Scheduling Time Elements and Reduction in the Routing |
33차시 | Allowing for Scrap in the Routing |
34차시 | Engineering Workbench |
35차시 | Product Lifecycle Management (PLM) Web User Interface |
36차시 | Customizing |
37차시 | Material |
38차시 | Routing |
39차시 | Outlining Supply Chain Planning at a Glance |
40차시 | Outlining Production Planning in SAP S/4HANA |
41차시 | Outlining Master Data for SAP S/4HANA Production Planning |
42차시 | Outlining Demand Management in SAP S/4HANA |
43차시 | Planning Make-to-Stock Production |
44차시 | Planning Make-to-Order Production |
45차시 | Applying Demand Management Enhancements |
46차시 | Outlining Prerequisites, Setting Up, and Executing MRP |
47차시 | Highlighting Technical Process Steps of MRP |
48차시 | Outlining Advanced Planning: PP/DS in SAP S/4HANA |
49차시 | Reviewing Master Data for Advanced Planning |
50차시 | Activating Advanced Planning |
51차시 | Evaluating Alerts with the Alert Monitor |
52차시 | Planning Production with the Product View |
53차시 | Recapitulating Planning Strategies 20 and 50 |
54차시 | Recapitulating Planning Strategies 40 and 70 |
55차시 | Exploring Steps in PP/DS Material Requirements Planning |
56차시 | Exploring Heuristics and Functions in PP/DS |
57차시 | Applying the PP/DS Planning Run |
58차시 | Exploring Concepts and Principles for Detailed Scheduling |
59차시 | Applying Transactional Tools for Detailed Scheduling |
60차시 | Applying Apps for Detailed Scheduling |
61차시 | Using the PP/DS Optimizer |
62차시 | Outlining Demand-Driven Replenishment |
63차시 | Outlining SAP Fiori and the System Landscape |
64차시 | Outlining Production Orders |
65차시 | Processing a Production Order |
66차시 | Analyzing the Order Structure |
67차시 | Creating Production Orders |
68차시 | Analyzing Master Data Selection |
69차시 | Scheduling Production Orders |
70차시 | Describing the Costing of Production Orders |
71차시 | Performing Availability Checks |
72차시 | Discussing Capacity Planning |
73차시 | Releasing Production Orders |
74차시 | Printing Shop Floor Papers |
75차시 | Performing Material Staging and Goods Issue Postings |
76차시 | Confirming Production Orders |
77차시 | Posting Goods Receipts |
78차시 | Performing Order Settlement |
79차시 | Archiving and Deleting Production Orders |
80차시 | Outlining Informations Systems and Reporting |
81차시 | Outlining Mass Processing and Automation |
82차시 | Outlining the Data Exchange with the Process Control Level |
83차시 | Outlining SAP S/4HANA Manufacturing for Production Engineering and Operations |
84차시 | Performing Order Splits |
85차시 | Creating Shift Notes and Shift Reports |
86차시 | Outlining Production Types |
87차시 | Exploring Process Orders: Characteristics and Execution |
88차시 | Exploring Repetitive Manufacturing: Characteristics and Execution |
89차시 | Exploring Kanban: Characteristics and Execution |
90차시 | Outlining SAP Fiori and the System Landscape |
91차시 | Outlining S/4HANA Capacity Planning |
92차시 | Evaluating with the Work Center Load Report |
93차시 | Using Further Capacity Evaluation Reports |
94차시 | Outlining the Manage Work Center Capacity App |
95차시 | Navigating the Tabular Planning Table |
96차시 | Dispatching Operations in the Tabular Planning Table |
97차시 | Navigating the Graphical Planning Table |
98차시 | Using Basic Scheduling and Dispatching Controls Settings |
99차시 | Using Additional Scheduling Control Settings for Interactive Planning |
100차시 | Using Floats to Limit Dispatching |
101차시 | Using Period Splits in Dispatching |
102차시 | Using Dispatching Sequences and Methods for Setup Time Optimization |
103차시 | Dispatching and Rescheduling with Production Versions |
104차시 | Dispatching and Deallocating Operations Using Background Processing |
105차시 | Modelling Down times in Capacity Planning |