메인메뉴로 이동 본문으로 이동

수강신청

SAP 온라인 교육을 통해 전문적인 지식과 기술을 학습하세요

컨텐츠 내용

  1. 수강신청
  2. 과정정보
SAP S/4HANA PP 마스터 패키지
SAP S/4HANA PP 마스터 패키지 과정정보
수강기간 60일 / 인강 (화상교육 3일)
강의구성 105차시 / 인강
수강료 3,190,000원


PP 마스터 패키지_A.png

 

강의목차
차시 강의명
1차시 강사 인트로
2차시 Accessing and Creating Types of Data
3차시 Using Organizational Elements and Master Data in Production
4차시 Introducing Material
5차시 Creating a Material
6차시 Assign Documents
7차시 Classifying Material
8차시 Managing the Material
9차시 Working with the Product Master
10차시 Introducing Bills of Material (BOMs)
11차시 Managing BOMs
12차시 Changing BOMs with Engineering Change Management
13차시 Performing mass changes and working with browsers
14차시 Analyzing BOMs
15차시 Creating Work Centers
16차시 Creating Capacities in a Work Center
17차시 Explaining Task Lists
18차시 Creating Material Assignments and Component Allocations
19차시 Creating Suboperations and User-Defined Fields
20차시 Creating Product Versions
21차시 Creating Production Resources and Tools (PRTs)
22차시 Analyzing and Changing Task Lists
23차시 Describing Phantom Assemblies
24차시 Creating Co-Products and By-Products
25차시 Creating Alternative Components
26차시 Creating Multiple BOMs
27차시 Creating Variant BOMs
28차시 Modeling Sequences
29차시 Modeling Alternative Manufacturing Processes
30차시 Creating Reference Operation Sets
31차시 Applying Lead-Time Scheduling to Update a Material
32차시 Scheduling Time Elements and Reduction in the Routing
33차시 Allowing for Scrap in the Routing
34차시 Engineering Workbench
35차시 Product Lifecycle Management (PLM) Web User Interface
36차시 Customizing
37차시 Material
38차시 Routing
39차시 Outlining Supply Chain Planning at a Glance
40차시 Outlining Production Planning in SAP S/4HANA
41차시 Outlining Master Data for SAP S/4HANA Production Planning
42차시 Outlining Demand Management in SAP S/4HANA
43차시 Planning Make-to-Stock Production
44차시 Planning Make-to-Order Production
45차시 Applying Demand Management Enhancements
46차시 Outlining Prerequisites, Setting Up, and Executing MRP
47차시 Highlighting Technical Process Steps of MRP
48차시 Outlining Advanced Planning: PP/DS in SAP S/4HANA
49차시 Reviewing Master Data for Advanced Planning
50차시 Activating Advanced Planning
51차시 Evaluating Alerts with the Alert Monitor
52차시 Planning Production with the Product View
53차시 Recapitulating Planning Strategies 20 and 50
54차시 Recapitulating Planning Strategies 40 and 70
55차시 Exploring Steps in PP/DS Material Requirements Planning
56차시 Exploring Heuristics and Functions in PP/DS
57차시 Applying the PP/DS Planning Run
58차시 Exploring Concepts and Principles for Detailed Scheduling
59차시 Applying Transactional Tools for Detailed Scheduling
60차시 Applying Apps for Detailed Scheduling
61차시 Using the PP/DS Optimizer
62차시 Outlining Demand-Driven Replenishment
63차시 Outlining SAP Fiori and the System Landscape
64차시 Outlining Production Orders
65차시 Processing a Production Order
66차시 Analyzing the Order Structure
67차시 Creating Production Orders
68차시 Analyzing Master Data Selection
69차시 Scheduling Production Orders
70차시 Describing the Costing of Production Orders
71차시 Performing Availability Checks
72차시 Discussing Capacity Planning
73차시 Releasing Production Orders
74차시 Printing Shop Floor Papers
75차시 Performing Material Staging and Goods Issue Postings
76차시 Confirming Production Orders
77차시 Posting Goods Receipts
78차시 Performing Order Settlement
79차시 Archiving and Deleting Production Orders
80차시 Outlining Informations Systems and Reporting
81차시 Outlining Mass Processing and Automation
82차시 Outlining the Data Exchange with the Process Control Level
83차시 Outlining SAP S/4HANA Manufacturing for Production Engineering and Operations
84차시 Performing Order Splits
85차시 Creating Shift Notes and Shift Reports
86차시 Outlining Production Types
87차시 Exploring Process Orders: Characteristics and Execution
88차시 Exploring Repetitive Manufacturing: Characteristics and Execution
89차시 Exploring Kanban: Characteristics and Execution
90차시 Outlining SAP Fiori and the System Landscape
91차시 Outlining S/4HANA Capacity Planning
92차시 Evaluating with the Work Center Load Report
93차시 Using Further Capacity Evaluation Reports
94차시 Outlining the Manage Work Center Capacity App
95차시 Navigating the Tabular Planning Table
96차시 Dispatching Operations in the Tabular Planning Table
97차시 Navigating the Graphical Planning Table
98차시 Using Basic Scheduling and Dispatching Controls Settings
99차시 Using Additional Scheduling Control Settings for Interactive Planning
100차시 Using Floats to Limit Dispatching
101차시 Using Period Splits in Dispatching
102차시 Using Dispatching Sequences and Methods for Setup Time Optimization
103차시 Dispatching and Rescheduling with Production Versions
104차시 Dispatching and Deallocating Operations Using Background Processing
105차시 Modelling Down times in Capacity Planning